REB Group is a specialist contractor focusing on Demolition and Strip Out, and Enabling Works

Hoarding Installations

2400mm high WPB Plywood Hoarding installed on timber posts and secured to bespoke Ballast Boxes on a project in Lewisham. Supplied, installed, and painted by R.E.B Group.
 

Protection

R.E.B installed the Timber framework and plywood to protect a delicate architectural staircase in Victoria ahead of us undertaking the Strip out, demolition and structural alteration works.

HoardingSetup.jpg
Enabling.jpg

Enabling Works
& Site Set-Up

R.E.B undertook the site clearance, installed a temporary surface for our Site accommodation/Welfare along with forming a vehicle access route in preparation for us to undertake the full Remodelling and refurbishment works to a School in Bethnal Green.
 

Strip Out & Soft Strip

R.E.B undertook the full strip out of six adjoining retail Units back to base build to form the shell for one Larger Unit located on the lower ground floor of a busy shopping Centre in London.
 

StripOut1.jpg
DemolitionNewLogo.jpg

Demolition

R.E.B Undertook the full demolition of a Public House in East London as part of a larger contract for one of our repeat clients, the full scope of works included Asbestos removal and enabling works.